01
Prepare Subfloor
Confirm the substrate is structurally sound, clean, dry, flat and free from dust, grease or loose residue.
Resource Center
Installer-focused guidance, application standards, technical downloads and project support for SETTO Supreme S75 MS polymer timber flooring adhesive system.
Installation Guide
01
Prepare Subfloor
Confirm the substrate is structurally sound, clean, dry, flat and free from dust, grease or loose residue.
02
Use a 5-6 mm V-Notch Trowel
Apply SETTO Supreme S75 with a 5-6 mm V-notch trowel held at a 45 degree angle for controlled adhesive ridges.
03
Maintain 45 Degree Angle
Hold the trowel at approximately 45 degrees to create consistent adhesive height and transfer.
04
Check Adhesive Transfer
Structural bonding requires minimum 80% adhesive transfer between subfloor and timber flooring.
05
Use Full Coverage When Required
100% substrate coverage is required for full moisture and acoustic performance.
Video Library
Practical, on-site guidance showing correct trowel angle, adhesive transfer checking and full-coverage installation.
Request Video Access
Coming Soon
Real site practice video
Customer-approved jobsite footage will be published here.
Downloads
Review product description, technical data, field of application, installation procedure, clean-up, packaging and safety notes.
Download TDSSafety documentation can be supplied on request for project teams, distributors and professional installers.
Request SDSFAQs
Current estimates use the latest TDS coverage basis. Flooring type provides project context for technical support and quoting.
Use a 5-6 mm V-notch trowel as the standard site reference, subject to substrate, flooring and the latest TDS guidance.
Use 100% substrate coverage when full moisture and acoustic performance is required, subject to site conditions and latest TDS guidance.
Open time depends on temperature, humidity and site conditions. Always work within the current TDS guidance and verify adhesive transfer.
Need Support?